Waste Solar Panel Recycling Plant (10–20 Tons Per Day)
Executive Summary
The project aims to establish a state-of-the-art solar panel recycling facility capable of processing 10–20 tons of waste solar panels daily, including rejected, end-of-life, and municipal panels. The plant will recover high-value materials such as J-boxes, aluminum frames, copper, silicon powder, and plastics, supporting circular economy initiatives and sustainable waste management.
Objectives:
Proposed Technology Options:
2. Plant Capacity & Layout
|
Parameter |
Full Auto w/ Robot |
Full Auto w/o Robot |
Semi-Auto + Shredding |
|
Processing Capacity |
50–60 pcs/h (1000–2000 kg/h) |
50–60 pcs/h (1000–2000 kg/h) |
35–45 pcs/h (500–1200 kg/h) |
|
Daily Throughput |
20 tons/day + |
20 tons/day + |
10 tons/day + |
|
Labour Required |
4–5 |
5–6 |
5–6 |
|
Machine Footprint (L×W×H) |
‾45 × 8.5 × 5.2 m |
‾39 × 8.5 × 5.2 m |
‾31 × 6.3 × 5 m |
|
Rated Power Consumption |
180 kW |
170 kW |
189 kW |
|
Recovered Products |
J-box, Aluminum frame, Copper, Silicon powder, Plastic |
J-box, Aluminum frame, Copper, Silicon powder, Plastic |
J-box, Aluminum frame, Copper, Silicon powder, Plastic |
|
Automation Level |
Fully automatic |
Fully automatic |
Semi-automatic |
3. Technology Description
3.1 Fully Automatic Recycling Solution (with Robotic Feeding)
3.2 Fully Automatic Recycling Solution (without Robotic Feeding)
3.3 Semi-Automatic Frame & J-Box Removal + Shredding & Sorting Plant
4. Process Workflow
5. Utilities Requirement
|
Utility |
Requirement |
|
Electricity |
170–190 kW (depending on technology) |
|
Labour |
4–6 operators per shift |
|
Compressed Air |
‾100–150 L/min |
|
Water |
Minimal, for cleaning and dust suppression |
6. Financial Overview (Indicative)
|
Solution |
Estimated Plant Cost (USD) |
Installation & Commissioning |
Total CapEx (USD) |
|
Full Auto w/ Robot |
525,000 |
50,000 |
575,000 |
|
Full Auto w/o Robot |
435,000 |
50,000 |
485,000 |
|
Semi-Auto + Shredding |
270,000 |
50,000 |
320,000 |
Notes:
Revenue Streams:
7. Environmental & Regulatory Compliance
8. Project Implementation Schedule
|
Activity |
Duration |
|
Project Design & Equipment Procurement |
2–3 months |
|
Shipping & Customs Clearance |
1 month |
|
Installation & Commissioning |
2–3 months |
|
Trial Production |
1 month |
|
Commercial Operation |
Month 7 onwards |
9. Risk Assessment
10. Conclusion
This 10–20 tons/day solar panel recycling plant is aligned with renewable energy sustainability, circular economy principles, and environmental compliance. It offers significant material recovery, cost-effective operations, and potential for high ROI for investors, while addressing the growing issue of solar panel waste.